Rapid Property Maintenance & Refurbishment Project – Bar & Restaurant, Leicester

Client: Bar & Restaurant | Project: Bar & Restaurant Refurbishment | Duration: 1 Week |
Location:
Leicester

Project overview

Jigsaw Property Services were commissioned to carry out urgent remedial and refurbishment works at a popular bar and restaurant in the heart of Leicester. The project involved essential repairs to the main bar floor and upgrades to back-of-house hygiene standards – all to be delivered under a strict one-week turnaround to avoid disruption to valuable weekend trade.

Our Approach

Bar area:

  • Uplift and removal of the existing floor covering and rotted sub-floor.
  • Rebuild of the entire floor structure using new treated timber and high-grade plywood.
  • Application of a liquid damp-proof membrane (DPM) to prevent future water ingress.
  • Installation of a self-levelling screed to ensure a smooth, even surface.
  • Supply and fitting of new cap-and-cove vinyl floor covering, offering durability and easy maintenance.

Kitchen and Pot Wash Area:

  • Installation of White Rock hygienic cladding and stainless steel cladding to the cooking areas throughout, improving hygiene compliance and cleanliness in food preparation and washing zones.

Challenges and Solutions

The primary challenge was the tight timeframe. With weekend revenue at stake, the client requiredall works to be completed and the venue fully operational within just five days. Any delay risked significantloss of income and customer confidence.

In addition, the bar area’s sub-floor was severely compromised. Water ingress, caused by a failed floor covering, had led to rot throughout the structural timber. This posed a health and safety risk and required immediate attention.Simultaneously, the client requested an upgrade to hygiene standards in the kitchen and pot wash areas by installing a hygienic wall cladding system and stainless steel to the cooking areas– adding complexity and scale to the already time-sensitive project.

The Results

To meet the tight deadline, Jigsaw Property Services mobilised a substantial labour force, working extended shifts across the entire week. A coordinated approach, strict scheduling, and clear communication were essential to keep each phase on track.

Despite the volume of work and short timeframe, our experienced team delivered all aspects of the project on time and to a high standard.

  • Project completed within 5 days
  • Venue reopened in time for weekend trading
  • Significantly improved structural safety and hygiene compliance
  • Minimal disruption to business operations
  • A satisfied client and successful outcome underpressure

Conclusion

This project highlights our ability to deliver high-quality property maintenance services under tight deadlines and within live retail environments. Our attention to detail, commitment to health and safety, and flexible working approach make us the preferred partner for retail and commercial clients alike.

Project gallery

Click an image to explore the transformation this project

Project gallery image of various stages of work and completion. Click to open the image gallery of this project

Get Your Free Quote Today

Contact us now for personalised service and a comprehensive quote tailored to your needs.

By clicking “Accept”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.